Albert River Culvert Renewal

Client: Wellington Shire Council Type: Waterway management Timing: February – March 2014 This project comprised of relining the invert in 40 metre long corrugated metal road culvert.  The existing corrugated metal invert was highly corroded and deteriorated. The works included removal of the existing culvert invert and installing a reinforced concrete lining.