Client: Department of Environment, Water & Natural Resources Type: Lump sum, construct only Timing: December 2013 – March 2014 EcoProjects was engaged to construct three wetland regulating structures adjoining the Murray River in South Australia. These structures will enable manipulation of the watering regime of a RAMSAR listed wetland along the Murray River floodplain. Works include, dewatering, site excavation, pouring of blinding concrete, placement of pre cast concrete units, fitting of regulating gates, rock beaching and site rehabilitation.
Roadside Mulching
Client: Department of Environment & Primary Industries Type: Vegetation management Timing: February 2014 EcoProjects Australia was engaged to reduce overall fuel hazard along identified roadsides in the Costins Road, Upper Tanjil area. Approximately 40 kilometres of roadside mulching was conducted to a width of 6 metre each side of the road. The specified works will be conducted using a 20 tonne excavator fitted with a rotary disc mulcher head attachment.
Nigra Creek Wetland Regulator
Client: Department of Environment, Water & Natural Resources Type: Lump sum, construct only Timing: November – December 2013 EcoProjects was engaged to construct a wetland regulating structures adjoining the Murray River in South Australia. These structures will enable manipulation of the watering regime of a RAMSAR listed wetland along the Murray River floodplain. Works include, dewatering, site excavation, pouring of blinding concrete, placement of pre cast concrete units, fitting of regulating gates, rock beaching and site rehabilitation.