• Home
  • About
  • Careers at EcoProjects
  • Contact
  • News –
  • Projects
  • Services
    • Coastal Management
    • Public Infrastructure
    • Resource Recovery
    • Site Remediation
    • Stormwater Management
    • Waterway Management
  • Facebook
  • LinkedIn

Search

  • About
  • Careers at EcoProjects
  • Services
    • Waterway Management
    • Stormwater Management
    • Coastal Management
    • Public Infrastructure
    • Site Remediation
    • Resource Recovery
  • Projects
  • News –
  • Contact

Download our brochure

> Eco Projects Australia company brochure

Recent Posts

  • Upper Yarra Aqueduct Safety
  • Wetland construction in Melbourne’s west
  • Recycling operations – our own war on waste
  • Surf Coast Walk Realignment
  • Allambee Tree Removal
  • Facebook
  • LinkedIn

EcoProjects Australia

EcoProjects Australia

Water & environmental infrastructure specialists

  • Home
  • About
  • Careers at EcoProjects
  • Contact
  • News –
  • Projects
  • Services
    • Coastal Management
    • Public Infrastructure
    • Resource Recovery
    • Site Remediation
    • Stormwater Management
    • Waterway Management

Albert River Culvert Renewal

Eco Projects Australia March 20, 2014

Client: Wellington Shire Council Type: Waterway management Timing: February – March 2014 This project comprised of relining the invert in 40 metre long corrugated metal road culvert.  The existing corrugated metal invert was highly corroded and deteriorated. The works included removal of the existing culvert invert and installing a reinforced concrete lining.

Read More

Bunyip Reach Wetland Regulators

Bunyip Reach Wetland Regulators

Eco Projects Australia March 16, 2014

Client: Department of Environment, Water & Natural Resources Type: Lump sum, construct only Timing: December 2013  – March 2014 EcoProjects was engaged to construct three wetland regulating structures adjoining the Murray River in South Australia. These structures will enable manipulation of the watering regime of a RAMSAR listed wetland along the Murray River floodplain. Works include, dewatering, site excavation, pouring of blinding concrete, placement of pre cast concrete units, fitting of regulating gates, rock beaching and site rehabilitation.

Read More

DEPI Roadside Mulching

Roadside Mulching

Eco Projects Australia February 16, 2014

Client: Department of Environment & Primary Industries Type: Vegetation management Timing: February 2014 EcoProjects Australia was engaged to reduce overall fuel hazard along identified roadsides in the Costins Road, Upper Tanjil area. Approximately 40 kilometres of roadside mulching was conducted to a width of 6 metre each side of the road. The specified works will be conducted using a 20 tonne excavator fitted with a rotary disc mulcher head attachment.

Read More

← 1 … 3 4 5 6 7 8 →
© Copyright EcoProjects Australia 2025