Client: Yarra Valley Water Type: Public Infrastructure Timing: August 2017 EcoProjects were engaged by Yarra Valley Water to upgrade access and associated drainage for the Beveridge pressure reducing station. The project involved the excavation of the existing material, construction of a base, followed by placement of ballast and toppings. Once earthworks were completed table drains were constructed to manage runoff and a culvert was installed to provide all weather accessibility to the site.